In Water Flowing From The Sanctuary Mission, Construction To Establish Optic Line Was Postponed
In Water Flowing From The Sanctuary Mission, the construction to establish optic line was scheduled on Friday, September 25 from 1pm through to 3pm today, but was postponed. The date of construction will be informed when it is decided. The telephone, fax and mail to the Mission is connected tentatively for the rest of this month. (The construction is estimated to be executed next month.)
